A Plus Marble

Your Kitchen Remodel Timeline: What You Need to Know

Your Kitchen Remodel Timeline: What You Need to Know

Your Kitchen Remodel Timeline: What You Need to Know

From all home renovation projects, including bathroom, living room, landscaping, and interior design transformation, nothing boosts the comfort and home value like (renovating kitchens).

Estimated Read Time:
Share:

(Understanding the timeline of a kitchen remodel) project allows you to budget more efficiently, communicate with greater confidence.

So, let’s explore the detailed (kitchen renovation timeline) so you can manage the project better.

Planning Phase

  • 2 – 3 weeks

Include the planning phase in the (kitchen renovation schedule), because it is the initial phase in which you can set a solid foundation for all other project stages.

Initial Planning and Budgeting  

Start by focusing on your goals and priorities. Do you want to make the kitchen more functional, transform the style, increase the storage space, improve the look, or all of the above?

Research prices, and financing options to set a realistic budget. Dedicate a portion of your total budget for unexpected costs, for material, labor work, appliances, etc.

Design and Inspiration

For some people the design stage in the (kitchen remodel timeline) lasts the longest if they cannot decide on the style and looks. For other people, it is the most exciting phase where all the magic begins.

You can get inspiration online, for websites, and dedicated Pinterest and Instagram pages.

If you know how to work with design software, create a desired layout, or hire a kitchen designer.

Finding a Contractor

Finding a reliable contractor is one of the (stages of a typical kitchen renovation) that should never be rushed. Finding a reliable contractor can take time, but if you have previous experience with home improvement contractors or trustworthy recommendations, you may speed up the process. 

Here are a few tips to ensure success:

  • Research online reviews and get recommendations from past clients
  • Verify formal credentials, licenses, and certifications
  • Get estimates from at least three contractors
  • Evaluate communication
  • Ensure the contract is detailed and understandable

Pre-Construction Phase

  • 2 – 6 weeks

Pre-construction phase focuses on planning and preparation works while ensuring the construction phase runs smoothly.

Finalizing the Design

Discuss the final kitchen design with your contractor and make the necessary adjustments. At this phase, you should pick the materials for cabinets, floors, fixtures, appliances, etc.

Ensure your contractor has applied and obtained the necessary construction permits and approvals before the construction begins.

Ordering Materials

The next step in your (kitchen remodeling timeline) is ordering materials. You or your contractor will find the best deals for the required materials and order them before the construction phase. Keep in mind that you may have to wait longer than the supplier may have specified, due to unexpected delays or special-order, custom-made items.

Preparing Your Home

To get ready for the (kitchen renovation process) come up with a meal plan for the family. You can also find a spare area in your home to install a temporary kitchen space for quick meal prep. 

Remove everything from the kitchen and protect the surrounding areas from dirt and dust. 

Construction Phase 

(How long does a kitchen remodel take) mostly depend on the duration of the construction stage. There are several stages in this phase:

Demolition

  • 1 – 2 weeks

To get (your dream kitchen), you first need to demolish the old one. Typically, the demolition phase lasts from one to two weeks and includes total removal and disposal of:

  • Cabinets
  • Appliances
  • Countertops
  • Flooring
  • Walls strips or tiles

For partial (kitchen remodel project), the demolition phase lasts shorter.

Structural Changes and Rough-In Work

  • 1 – 2 weeks

Once everything is removed and your contractor has a blank canvas to work on, the team can begin with structural changes. Those include:

  • Wall removal
  • Adding support beams
  • Changes to doorways and windows
  • Flooring replacement
  • Changes to the ceiling
  • Plumbing relocation
  • Electrician and HVAC system rewiring
  • Installing ventilation or relocating ductwork

The team may need one to two weeks to complete all structural changes, or even more if major changes are required.

Inspection and Approval

  • 1 – 2 days

If you schedule the inspection for HVAC, plumbing, and electrical work on time, you will only have to wait for a day or two for inspectors to arrive and give their approval.

In case of missing approval, you’ll have a deadline to adjust the necessary work to adhere to the set standards and requirements, which may last an additional day or two.

Drywall and Paint

  • 1 – 2 weeks

In the next one or two weeks, the technicians will install drywall and prepare the surface for painting.

The preparation phase may take a couple of days, because of the sanding and mud seams for a smooth surface and even finish.

Once everything is prepared, the team will start painting the walls and ceiling.

Flooring Installation

  • 1 – 2 weeks

If there are no delays with the material delivery, the team will proceed with flooring installation. The (kitchen remodel schedule) for flooring depends on the size of your kitchen and the installation complexity of the chosen flooring type. 

Laminate is the easiest and quickest to install, and hardwood may take a few days longer than other flooring types.

On average, dedicate one or two weeks to your (timeline for kitchen remodel).

Cabinet and Countertop Installation

  • 1 -2 weeks

During the next two weeks, your (kitchen space) will start getting its shape. Normally, the installation of kitchen cabinets and countertops lasts from one to two weeks.

Proper installation of custom-made kitchen cabinets may last longer than manufactured ones because of a need for precise alignment and custom fittings.

In addition, there are several common bottlenecks that may lengthen this phase in big or (small kitchen remodel timeline), such as:

  • Measurement errors cause ill-fitting cabinets and require adjustments
  • Delivery delays – postpones the process
  • Detecting structural issues and making adjustments
  • Unforeseen issues – damage or missing tools, materials, or skills

Appliance and Fixture Installation

  • 1 week

When the kitchen countertops are properly installed, the contractor needs one week or less to install sinks, faucets, and lighting fixtures. If your appliances arrive on time, during that week, you can install and test them for proper work.

It will give you time to return products and wait for repairs or replacements.

Final Touches and Finishing Work

  • 1 week

At this point, you’re only a week away from the last project stage. The technicians do the final touches and install backsplashes, trim, and molding.

The week is full of measuring, cutting, and applying adhesive to ensure there are no gaps.

If the walls need touch-ups or there are loose fittings, the technicians can fix them. Final touches improve the appearance and subtle details in your kitchen.

Post-Construction Phase 

There are just a few steps to take until the end of the project, related to inspection, cleaning, and cooking your first meal in your fresh new kitchen.

Final Inspection and Walkthrough 

  • 1 – 2 days

Conduct a final inspection of (kitchen design) and construction work to identify any missouts and address them. Be honest and thorough and test of:

  • Cabinets and Countertops: Inspect alignment and functionality of drawers and cabinet doors.
  • Appliances: Test if your new appliances work properly functioning.
  • Plumbing and Electrical: Test faucets, drainage, outlets, and lighting.
  • Backsplashes and Tiles: Inspect grout lines and placement
  • Flooring: Look for visible defects.
  • Paint and Finishes: Check for stains and evaluate and quality of the work

Talk with your contractor about your concerns and ask for repairs and adjustments. 

Clean-Up

  • 1 – 2 days

Clean your new kitchen thoroughly, remove debris, dirt, and vacuum. Sanitize kitchen surfaces and dispose of the leftover waste. Ventilate the room to ensure fresh air and add a personal touch with flowers or small decor items. 

Move-In and Enjoy 

Once everything is complete, you can move in and bring your dishes, fill in the refrigerator, and bring the family for a first homemade meal in your new kitchen. Don’t forget to keep in mind the specific maintenance requirements for the materials used in your kitchen to ensure long-lasting performance and the great appearance of your kitchen.

Conclusion 

(Planning your kitchen remodel) is fun and stressful, especially if you aren’t prepared for delays, and if you don’t know what to expect. 

Compile (your ideas and inspiration) and start planning the budget, design, and find the contractor. Once the initial phase is complete, the construction phase takes the longest time, but it is when your kitchen starts to get its final shape and look. 

Lastly, inspection is just as important as the rest of the process and it ensures everything is functional and completed according to your needs and preferences. 

FAQ

Can I use my home during the kitchen renovation?

Yes, you can, but ensure you protect the adjacent areas from dust and debris. Also, plan your meals and set up a temporary kitchen and dining space during the renovation.

What factors can affect the timeline of a kitchen remodel?

If you have arranged a kitchen remodel timeline, expect potential delays due to prolonged lead times, unexpected damage, permits and approval complications, budget constraints, design changes, and weather. 

How long does a kitchen remodel take?

Simple kitchen remodeling projects take between six and eight weeks, and most complex ones can last from three to six months. 

What does the final inspection and walkthrough include?

The final stage includes thorough testing of all appliances, fixtures, and quality control to review the completed work against the contract. Remember to keep copies of your warranties and address all your concerns before you sign the certificate of completion.

Other Posts